Location: Docked at Deltaville Marina. Jackson Creek. 37°33'21"N 076°23'0"W.
This week continues the refit of the past years, but now that we live aboard, it's done at a more accelerated tempo. Just reviewing my notes to write this is tiring.
17th. Monday

Install vent and wiring for Nature's Head. Fill hole in floor. Fill plumbing access holes with wood salvaged from removing drawers.
18th. Tuesday
Physical so we can buy health insurance. Find some

preliminary locations of food items in what was formerly the refrigerator and freezer. Some things will be moved as we gain experience in the galley.
19th. Wednesday
Install Island Time PC Marine Wi-Fi antenna system. Use the lounge for numerous software upgrades (Mac OS X, iOS, etc.) because the reception behind the boat shed on D-dock is pretty bad. Stow more stuff from the truck.
20th. Thursday
Pry up shower drain pan in forward shower. Thank Poseidon (Ποσειδῶν) that it was held down with a silicone or polysulfide adhesive. Plan the Whale Gulley IC shower drain pump installation. This will require a bronze through-hull and 10' of ¾" hose. Plus a long wiring run to a breaker that doesn't exist yet.
21st. Friday
Epoxy mounting boards to hull under the forward head shower. Continue stowing items from the truck.
22nd. Saturday

Rewire electrical panel to replace bottom three (inconsistent) horizontal breakers with four (consistent) vertical breakers. Add a momentary on switch and relay for the macerator pump so that the breaker doesn't carry the whole load.
Party on Blind Faith with crew of Green Eyes, Hope Floats, Mandy and Lady Sarah.
23rd. Sunday
Lunch with Liquid Therapy. Start Bimini installation. Revise Blog. Move sewing machine aboard. Almost everything is out of the truck.
Whew.
It appears that next week will be similarly busy.